Sign In | Join Free | My components-electronic.com |
|
Brand Name : Velp
Model Number : Cement formworks mesh
Certification : SGS CE ISO 9002
Place of Origin : China
MOQ : 50sqm
Price : USD2-3/SQM
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 20000sqm/week
Delivery Time : 10-15 days
Packaging Details : waterproof paper + wooden pallet
Keywords : Permanent cement formwork system
Advantages : Joint strength, long lasting
Feature : lightweight,corrosion resistance,
Compose : Rib lath, C profile,Connectors, Longitudinal rebar
Lightweight : 11kg/sqm, can carried by 1-2 workers.
Size : 1.1*3m
---Cement Pouring formwork structure COMPOSITION
The two sides weighs 11 kg/m2. It is composed of:
Rib Lath
Expanded metal with rib produced from commercial quality cold rolled and hot galvanized steel in accordance with ASTM C 847.
0.5 mm thickness.
C-Profiles
Produced from commercial quality cold rolled and hot galvanized steel in accordance with ASTM C 847.
0.6 mm thickness.
Connectors
Made from steel in coil grade B DIN 17 223 or equivalent.
20 mm width.
1.5mm thickness.
Longitudinal Rebar
Made from Fe 400 (French Norm) or equivalent.
500 N/mm2 elasticity limit.
700 N/mm2 traction strength.
5 mm diameter (minimum).
---Product introduction and advantages
Hy-Rib is a high-ribbed, sacrificial formwork solution engineered for superior performance in large-scale concrete construction. Made from galvanised expanded metal mesh, Hy-Rib ensures durability and structural reliability while simplifying the construction process. Its unique ribbed design promotes excellent aggregate interlock, delivering enhanced joint strength and long-lasting concrete durability.
This versatile formwork system is suitable for both horizontal and vertical placements and eliminates the need for extensive surface preparation, such as scabbling. Its high visibility during concrete pours enables precise visual monitoring, reducing the risk of voids and honeycombing. Hy-Rib optimises labour efficiency, minimises formwork pressure, and accelerates the pouring process, providing economic advantages to construction projects.
![]() |
Hy Rib Lath Concrete Reinforcement Formwork In Swimming Pool Construction Images |